Past Projects
Singapore
PPL Ship Yard
21 Pandan Road Singapore
Blasting and painting for the entire new build Jack-up rig P Class 400 estimated area 140,000m2 per rig.
From 2005 to 2017 we have completed a total 20 Jack-up unit.
Global Offshore Marine
48 Tuas Rd, Singapore 638500
1. Erect scaffolding for Jack-up rig 3 in nos. of leg section up to 375 feet per leg.
2. Carried out Grit blasting and Hydro Jetting for repairs work for a total of 9 Jack-up rig for various location including tank, ship side, cantilever, drill floor, leg etc.
Seatrium (SG) Pte Ltd
60 Admiralty Road West, Singapore 759956
1.1 Blasting and painting new build top side module and LQ @ AY2 Offshore Platform.
– EPC FPSO Karish & Tanin
– Statoil Johan Castberg
– Tyra Wellheads Fabrication Sub
– Hornsea II Topsides
1.2 Erect Scaffold, Abrasive blasting, Hydro Jetting, Power tooling and painting for repair and conversation projects.
– Flintstone
– Kaombo Norte
– Kombo SUL
– Repair vessel
1.3 Using Robotic to carry out Hydro Jetting works for Repair vessel ship hull.
Area archived – 350,000m2
Indonesia
Siemens
Batam, Indonesia
– APLNG
– Exxon Mobile
– Upper Zakum
– Yamal LNG
Sembcorp
Karimun, Indonesia
Saipem
Batam, Indonesia
Supply scaffolder and scaffold material in Indonesia offshore project